Vessel Track Records
Bourbon Helene
Start: 2006
End: 2015
End Client: TOTAL Angola
Location: Angola:
Girassol: 1400m water depth
Rosa: 1350m water depth
Dalia: 1500m water depth
Activities: Deepwater IRM support (2 x WROV)
- Control pod/choke replacement
- LBL array set up
- Annual survey
ROV System: 2 x WROV
End: 2015
End Client: TOTAL Angola
Location: Angola:
Girassol: 1400m water depth
Rosa: 1350m water depth
Dalia: 1500m water depth
Activities: Deepwater IRM support (2 x WROV)
- Control pod/choke replacement
- LBL array set up
- Annual survey
ROV System: 2 x WROV
Start: December 2017
End: June 2019
End Client: Reliance Industries Limited
Location: India:
KG D6 Block: 700 to 1300m water depth
Activities: Subsea intervention, transportation of materials to offshore installations (FPSO / CRP / Rig), search & rescue etc., in oil fields.
Maintenance, deploying, calibratingand positioning equipment, station keeping
ROV System: 1 x WROV
End: June 2019
End Client: Reliance Industries Limited
Location: India:
KG D6 Block: 700 to 1300m water depth
Activities: Subsea intervention, transportation of materials to offshore installations (FPSO / CRP / Rig), search & rescue etc., in oil fields.
Maintenance, deploying, calibratingand positioning equipment, station keeping
ROV System: 1 x WROV
Bahtera Azalea (ex-Bourbon Supporter)
Start: September 2010
End: January 2013
End Client: ARGAS
Location: Saudi Arabia
Activities: Mother Recorder Vessel for seismic activities support
(Equipped with 2 x 20"" Quality Control Modular offices, 2 x 40"" Recorder Modular offices, 2 berthing supports for work boat and 4 shell chutes)
ROV System: Nil
End: January 2013
End Client: ARGAS
Location: Saudi Arabia
Activities: Mother Recorder Vessel for seismic activities support
(Equipped with 2 x 20"" Quality Control Modular offices, 2 x 40"" Recorder Modular offices, 2 berthing supports for work boat and 4 shell chutes)
ROV System: Nil
Start: May 2013
End: May 2015
End Client: Chevron Thailand
Location: Thailand
Activities: Well plug and abandonment activities support
- Well cementing
- Hydraulic workover rig deployment
- Floatel
ROV System: Nil
End: May 2015
End Client: Chevron Thailand
Location: Thailand
Activities: Well plug and abandonment activities support
- Well cementing
- Hydraulic workover rig deployment
- Floatel
ROV System: Nil
Start: July 2015
End: December 2017
End Client: Brunei Shell Petroleum
Location: Brunei
Activities: Shallow water IRM support (1 x Air dive system, 2 x WROV)
- I/J Tube installation
- Piepline repair
- Riser repair
- Free Spans correction
- Subsea asset/line survey
ROV System: 2 x WROV
End: December 2017
End Client: Brunei Shell Petroleum
Location: Brunei
Activities: Shallow water IRM support (1 x Air dive system, 2 x WROV)
- I/J Tube installation
- Piepline repair
- Riser repair
- Free Spans correction
- Subsea asset/line survey
ROV System: 2 x WROV
Start: April 2018
End: June 2018
End Client: Petronas Carigali Sdn Bhd
Location: Malaysia:
Sabah and Sarawak waters: 500m water depth
Activities: Sarawak: Pipeline Inspection Survey (1x WROV)
Sabah: Anode Installation and Pipeline Inspection Survey
ROV System: 1 x WROV
End: June 2018
End Client: Petronas Carigali Sdn Bhd
Location: Malaysia:
Sabah and Sarawak waters: 500m water depth
Activities: Sarawak: Pipeline Inspection Survey (1x WROV)
Sabah: Anode Installation and Pipeline Inspection Survey
ROV System: 1 x WROV
Start: July 2018
End: July 2018
End Client: ROC Oil
Location: Malaysia
Activities: Debris Survey and Removal (1 x WROV)
ROV System: 1 x WROV
End: July 2018
End Client: ROC Oil
Location: Malaysia
Activities: Debris Survey and Removal (1 x WROV)
ROV System: 1 x WROV
Start: October 2018
End: October 2018
End Client: Carigali Hess
Location: Malaysia
Activities: Jacket and Pipeline Inspection (1 x WROV)
ROV System: 1 x WROV
End: October 2018
End Client: Carigali Hess
Location: Malaysia
Activities: Jacket and Pipeline Inspection (1 x WROV)
ROV System: 1 x WROV
Start: November 2018
End: December 2018
End Client: Petronas Carigali Sdn Bhd
Location: Malaysia
Activities: Debris survey removal and mattress installation (1 x WROV)
ROV System: 1 x WROV
End: December 2018
End Client: Petronas Carigali Sdn Bhd
Location: Malaysia
Activities: Debris survey removal and mattress installation (1 x WROV)
ROV System: 1 x WROV
Start: January 2019
End: January 2019
End Client: ROC Oil
Location: Malaysia:
D35 field: 50m water depth
Activities: Debris Survey and General Visual Inspection (1 x WROV)
ROV System: 1 x WROV
End: January 2019
End Client: ROC Oil
Location: Malaysia:
D35 field: 50m water depth
Activities: Debris Survey and General Visual Inspection (1 x WROV)
ROV System: 1 x WROV
Start: February 2019
End: March 2019
End Client: SHELL BUKOM
Location: Singpore:
Pulau Bukom: 11m water depth
Activities: Diving support (with mooring)
ROV System: Nil
End: March 2019
End Client: SHELL BUKOM
Location: Singpore:
Pulau Bukom: 11m water depth
Activities: Diving support (with mooring)
ROV System: Nil
Start: May 2019
End: June 2019
End Client: AME/ Repsol / HGIS
Location: Malaysia
Activities: Debris Survey and Removal (1 x WROV)
ROV System: 1 x WROV
End: June 2019
End Client: AME/ Repsol / HGIS
Location: Malaysia
Activities: Debris Survey and Removal (1 x WROV)
ROV System: 1 x WROV
Start: June 2019
End: Present
End Client: AME / Petrofac / Petronas Carigali Sdn Bhd / ExxonMobil
Location: Malaysia
Activities: IRM support for Pan Malaysia contract (2 x ROV)
ROV System: Triton XL43 Seaeye Tiger 845
End: Present
End Client: AME / Petrofac / Petronas Carigali Sdn Bhd / ExxonMobil
Location: Malaysia
Activities: IRM support for Pan Malaysia contract (2 x ROV)
ROV System: Triton XL43 Seaeye Tiger 845
Bourbon Enterprise
Start: May 2010
End: June 2010
End Client: Augusta
Location: Tunisia
Activities: Hook up support for a platform in Mediterranean Sea
ROV System: 2 x WROV
End: June 2010
End Client: Augusta
Location: Tunisia
Activities: Hook up support for a platform in Mediterranean Sea
ROV System: 2 x WROV
Start: June 2010
End: March 2011
End Client: Fluor Bard / Jade Dientst OMM
Location: United Kingdom
Activities: Windfarm support in North Sea
- Support for trenching using JET system and AHC crane, side survey, grouting operationgs on windmills, crane operation on windmills, floatel (pax transfer using Ampelmann gangway), air diving support, trenching using crane on J tubes, ROV rescue
ROV System: Nil
End: March 2011
End Client: Fluor Bard / Jade Dientst OMM
Location: United Kingdom
Activities: Windfarm support in North Sea
- Support for trenching using JET system and AHC crane, side survey, grouting operationgs on windmills, crane operation on windmills, floatel (pax transfer using Ampelmann gangway), air diving support, trenching using crane on J tubes, ROV rescue
ROV System: Nil
Start: March 2011
End: April 2011
End Client: BARD
Location: United Kingdom
Activities: Floatel support
ROV System: Nil
End: April 2011
End Client: BARD
Location: United Kingdom
Activities: Floatel support
ROV System: Nil
Start: April 2011
End: October 2011
End Client: Jade Dientst
Location: Germany:
35mm water depth
Activities: Trenching by air lifter to access J tubes on Bard Platform
ROV System: Nil
End: October 2011
End Client: Jade Dientst
Location: Germany:
35mm water depth
Activities: Trenching by air lifter to access J tubes on Bard Platform
ROV System: Nil
Start: June 2012
End: October 2012
End Client: Fugro Salt
Location: United Kingdom
Activities: Trenching support for 122 cables (Trenching machine + 1 x WROV)
ROV System: 1 x WROV
End: October 2012
End Client: Fugro Salt
Location: United Kingdom
Activities: Trenching support for 122 cables (Trenching machine + 1 x WROV)
ROV System: 1 x WROV
Start: December 2012
End: December 2014
End Client: TOTAL Congo
Location: Congo:
TOTAL fields: 150m water depth
Activities: Workover support, accommodation support, bunkering, crane handling, rescue activities- Multi Purpose Support Vessel on 4-point mooring
ROV System: Nil
End: December 2014
End Client: TOTAL Congo
Location: Congo:
TOTAL fields: 150m water depth
Activities: Workover support, accommodation support, bunkering, crane handling, rescue activities- Multi Purpose Support Vessel on 4-point mooring
ROV System: Nil
Start: April 2017
End: May 2017
End Client: HESS Exploration & Production Malaysia B.V.
Location: Malaysia:
Bergading field: 70m water depth
Activities: Topside pre-commissioning support work
ROV System: Nil
End: May 2017
End Client: HESS Exploration & Production Malaysia B.V.
Location: Malaysia:
Bergading field: 70m water depth
Activities: Topside pre-commissioning support work
ROV System: Nil
Start: August 2017
End: Present
End Client: Saipem / Saudi Aramco
Location: Kingdom of Saudi Arabia:
Abu Safa, Marjan: 8 to 50m water depth
Activities: Umbilical and cable laying
ROV System: 1 x ROV (Panther XT)
End: Present
End Client: Saipem / Saudi Aramco
Location: Kingdom of Saudi Arabia:
Abu Safa, Marjan: 8 to 50m water depth
Activities: Umbilical and cable laying
ROV System: 1 x ROV (Panther XT)
Surf Allamanda (ex-Bourbon Evolution 809)
Start: June 2016
End: September 2016
End Client: Chevron Indonesia
Location: Indonesia:
Bangka: 1800m water depth
Activities: Deep water light construction support (2 x WROV)
- Pre-commissioning support for EFL, HFL and flexible jumpers
ROV System: 2 x WROV
End: September 2016
End Client: Chevron Indonesia
Location: Indonesia:
Bangka: 1800m water depth
Activities: Deep water light construction support (2 x WROV)
- Pre-commissioning support for EFL, HFL and flexible jumpers
ROV System: 2 x WROV
Start: September 2016
End: October 2016
End Client: Chevron Indonesia
Location: Indonesia:
Bangka: 1800m water depth
Activities: Choke valve replacement (2 x WROV)
ROV System: 2 x WROV
End: October 2016
End Client: Chevron Indonesia
Location: Indonesia:
Bangka: 1800m water depth
Activities: Choke valve replacement (2 x WROV)
ROV System: 2 x WROV
Start: November 2016
End: January 2017
End Client: ENI Indonesia
Location: Indonesia:
Jangkrik field: 200m water depth
Activities: Deep water light construction support (2 x WROV)
- Pre-commissioning support and post trenching support
ROV System: 2 x WROV
End: January 2017
End Client: ENI Indonesia
Location: Indonesia:
Jangkrik field: 200m water depth
Activities: Deep water light construction support (2 x WROV)
- Pre-commissioning support and post trenching support
ROV System: 2 x WROV
Start: March 2017
End: May 2017
End Client: Marship
Location: Indonesia:
Batam: 100m water depth
Activities: Wreck survey support and oil recovery works(2 x WROV)
- ROV video survey, MBES, side scan sonar
- High resolution 3D video survey
- Vibrocoring of seabed
- Oil recovery from wreck with ROV customized kit
ROV System: 2 x WROV
End: May 2017
End Client: Marship
Location: Indonesia:
Batam: 100m water depth
Activities: Wreck survey support and oil recovery works(2 x WROV)
- ROV video survey, MBES, side scan sonar
- High resolution 3D video survey
- Vibrocoring of seabed
- Oil recovery from wreck with ROV customized kit
ROV System: 2 x WROV
Start: June 2017
End: June 2017
End Client: Galoc
Location: Philippines:
Galoc: 290m water depth
Activities: Anode installation on Christmas tree (2 x WROV)
ROV System: 2 x WROV
End: June 2017
End Client: Galoc
Location: Philippines:
Galoc: 290m water depth
Activities: Anode installation on Christmas tree (2 x WROV)
ROV System: 2 x WROV
Start: June 2017
End: August 2017
End Client: Saipem
Location: Indonesia:
Balikpapan, Jangkrik: 200m water depth
Activities: Acommodation support and passenger transfer using Ampelmann gangway
ROV System: Nil
End: August 2017
End Client: Saipem
Location: Indonesia:
Balikpapan, Jangkrik: 200m water depth
Activities: Acommodation support and passenger transfer using Ampelmann gangway
ROV System: Nil
Start: September 2017
End: November 2017
End Client: Carigali-PTTEPI Operating Company (CPOC)
Location: Malaysia/Thailand:
MTJDA: 55 - 65m water depth
Activities: Air diving and ROV inspection (1 x WROV + Inspection ROV + 1 x Air dive system)
ROV System: 1 x WROV 1 x Observation ROV
End: November 2017
End Client: Carigali-PTTEPI Operating Company (CPOC)
Location: Malaysia/Thailand:
MTJDA: 55 - 65m water depth
Activities: Air diving and ROV inspection (1 x WROV + Inspection ROV + 1 x Air dive system)
ROV System: 1 x WROV 1 x Observation ROV
Start: April 2018
End: December 2018
End Client: Medco Energi
Location: Indonesia:
Natuna: 100m water depth
Activities: Drill support and accommodation support
ROV System: Nil
End: December 2018
End Client: Medco Energi
Location: Indonesia:
Natuna: 100m water depth
Activities: Drill support and accommodation support
ROV System: Nil
Start: January 2019
End: April 2019
End Client: Kebabangan Petroleum Operating Company (KPOC), Sabah Shell, Murphy Oil, Sabah Oil
Location: East Malaysia:
Kikeh field: 1300m water depth
Malikai field: 500m water depth
Gumusut Kakap: 1200m water depth
Kebabangan: 400m water depth
Activities: Installation and recovery of seismic survey nodes
ROV System: 2 x WROV
End: April 2019
End Client: Kebabangan Petroleum Operating Company (KPOC), Sabah Shell, Murphy Oil, Sabah Oil
Location: East Malaysia:
Kikeh field: 1300m water depth
Malikai field: 500m water depth
Gumusut Kakap: 1200m water depth
Kebabangan: 400m water depth
Activities: Installation and recovery of seismic survey nodes
ROV System: 2 x WROV
Start: April 2019
End: May 2019
End Client: ENI Muara Bakau B.V.
Location: Indonesia:
Jangkrik Field, Balikpapan
Activities: Installation and ROV charter (first campaign)
ROV System: 2 x WROV
End: May 2019
End Client: ENI Muara Bakau B.V.
Location: Indonesia:
Jangkrik Field, Balikpapan
Activities: Installation and ROV charter (first campaign)
ROV System: 2 x WROV
Start: August 2019
End: Present
End Client: ENI Muara Bakau B.V.
Location: Indonesia:
Jangkrik Field, Balikpapan
Activities: Installation and ROV charter (second campaign)
ROV System: 2 x WROV
End: Present
End Client: ENI Muara Bakau B.V.
Location: Indonesia:
Jangkrik Field, Balikpapan
Activities: Installation and ROV charter (second campaign)
ROV System: 2 x WROV
Bourbon Evolution 807
Start: April 2015
End: July 2015
End Client: Brunei Shell Petroleum
Location: Brunei
CHAMPION field: 30m water depth
AMPA field: 40m water depth
Activities: Shallow water IRM support
(1 x Air dive system, 1 x ROV)
- I/J tube installation
- Pipeline repair
- Riser repair
- Free spans corrections
- Subsea asset/line survey"
ROV System: 1 x WROV
End: July 2015
End Client: Brunei Shell Petroleum
Location: Brunei
CHAMPION field: 30m water depth
AMPA field: 40m water depth
Activities: Shallow water IRM support
(1 x Air dive system, 1 x ROV)
- I/J tube installation
- Pipeline repair
- Riser repair
- Free spans corrections
- Subsea asset/line survey"
ROV System: 1 x WROV
Start: August 2015
End: August 2015
End Client: Petronas Carigali Sdn Bhd
Location: Malaysia:
D18: 30m water depth
Activities: Shallow water light construction
support (1x Air dive system, 1 x ROV)
- I/J tube installation
- Spool installation
- Subsea asset/line survey
ROV System: 1x ROV
End: August 2015
End Client: Petronas Carigali Sdn Bhd
Location: Malaysia:
D18: 30m water depth
Activities: Shallow water light construction
support (1x Air dive system, 1 x ROV)
- I/J tube installation
- Spool installation
- Subsea asset/line survey
ROV System: 1x ROV
Start: February 2016
End: June 2016
End Client: ONGC
Location: India:
G1 well S2AB: 250-400m
water depth
Activities: IRM support
- Troubleshooting on umbilical
supporting 2 existing wells
- Survey & reposition wet parked
flowiline
- Connect well S2AB to production
(flexible flowline and umbilical)
- Support to S2AB commissioning
Specific comments: operations in
very high current (successful up
to 3.5 knots)"
ROV System: 1x ROV
End: June 2016
End Client: ONGC
Location: India:
G1 well S2AB: 250-400m
water depth
Activities: IRM support
- Troubleshooting on umbilical
supporting 2 existing wells
- Survey & reposition wet parked
flowiline
- Connect well S2AB to production
(flexible flowline and umbilical)
- Support to S2AB commissioning
Specific comments: operations in
very high current (successful up
to 3.5 knots)"
ROV System: 1x ROV
Start: August 2015
End: October 2015
End Client: Petronas Carigali Sdn Bhd
Location: Malaysia:
D18: 30m water depth
Activities: Shallow water light construction support (1x Air dive system, 1 x ROV)
- I/J tube installation
- Spool installation
- Subsea asset/line survey
ROV System: 1 x WROV
End: October 2015
End Client: Petronas Carigali Sdn Bhd
Location: Malaysia:
D18: 30m water depth
Activities: Shallow water light construction support (1x Air dive system, 1 x ROV)
- I/J tube installation
- Spool installation
- Subsea asset/line survey
ROV System: 1 x WROV
Start: February 2016
End: June 2016
End Client: ONGC
Location: India:
G1 field: 450m water depth
Activities: Deep water light construction support (2 x WROV)
- Susbea asset/line survey
- Connection of umbilical, flowlines and flying leads
- Valve operations
ROV System: 2 x WROV
End: June 2016
End Client: ONGC
Location: India:
G1 field: 450m water depth
Activities: Deep water light construction support (2 x WROV)
- Susbea asset/line survey
- Connection of umbilical, flowlines and flying leads
- Valve operations
ROV System: 2 x WROV
Start: September 2016
End: November 2016
End Client: Petronas Carigali Sdn Bhd
Location: Malaysia:
Baronia BNV-A: 75m water depth
Activities: Shallow water IRM support (1x Air dive system, 1x ROV)
ROV System: 1 x WROV
End: November 2016
End Client: Petronas Carigali Sdn Bhd
Location: Malaysia:
Baronia BNV-A: 75m water depth
Activities: Shallow water IRM support (1x Air dive system, 1x ROV)
ROV System: 1 x WROV
Start: December 2016
End: June 2017
End Client: ONGC
Location: India:
Vashista & S1: 700m water depth
Activities: Deep water IRM support (2 x WROV)
- Debris removal
- Installation, maintenance and relocationof LBL arrays (deployment of tripods, transponders & calibration) (<2MT lift)
- Touchdown monitoring for DB30 & LVNO105 during pipelay and umbilical lay
- 4 Suction pile & initiation wire installation (70MT lift)
- Rigid jumper installation (50MT lift)
- Post lay survey works
- Psot lay trenching works (3rd party trenching spread: 20MT lift)
- As-Built survey
- Metrology for jumpers
- Flying lead installation
- SDU Mudmat installation (15MT lift)
- Free-span correction
- Xmas Tree installation (70MT lift)
- Pre-commissioning support
ROV System: 2 x WROV
End: June 2017
End Client: ONGC
Location: India:
Vashista & S1: 700m water depth
Activities: Deep water IRM support (2 x WROV)
- Debris removal
- Installation, maintenance and relocationof LBL arrays (deployment of tripods, transponders & calibration) (<2MT lift)
- Touchdown monitoring for DB30 & LVNO105 during pipelay and umbilical lay
- 4 Suction pile & initiation wire installation (70MT lift)
- Rigid jumper installation (50MT lift)
- Post lay survey works
- Psot lay trenching works (3rd party trenching spread: 20MT lift)
- As-Built survey
- Metrology for jumpers
- Flying lead installation
- SDU Mudmat installation (15MT lift)
- Free-span correction
- Xmas Tree installation (70MT lift)
- Pre-commissioning support
ROV System: 2 x WROV
Start: May 2018
End: May 2018
End Client: Vestigo Petroleum Sdn Bhd
Location: Malaysia:
Bentara Field
Block SK306: 64m water depth
Activities: Provision of LCV and ROV services for FSU Nautica Muar
- Pre-installation survey
- ROV monitoring during hook-up mooring chain to FSU Nautica Muar
- Debris removal prior to laying of flexile flowline
- Flexible flowline laying from FSU to WHP Bentara
- Post lay installation survey
ROV System: 1 x WROV
End: May 2018
End Client: Vestigo Petroleum Sdn Bhd
Location: Malaysia:
Bentara Field
Block SK306: 64m water depth
Activities: Provision of LCV and ROV services for FSU Nautica Muar
- Pre-installation survey
- ROV monitoring during hook-up mooring chain to FSU Nautica Muar
- Debris removal prior to laying of flexile flowline
- Flexible flowline laying from FSU to WHP Bentara
- Post lay installation survey
ROV System: 1 x WROV
Start: May 2018
End: June 2018
End Client: MISC / HESS
Location: Malaysia:
North Malay Basin PM302: 55m water depth
Activities: Offfshore piling support
- Pre/post installation survey
- Loading, seafastening and transportation of 1 SETP pile
- Installation and proof load 1 x ETP Pile
- Hook up and commissioning of FSO Mekar Bergading
ROV System: 1 x WROV
End: June 2018
End Client: MISC / HESS
Location: Malaysia:
North Malay Basin PM302: 55m water depth
Activities: Offfshore piling support
- Pre/post installation survey
- Loading, seafastening and transportation of 1 SETP pile
- Installation and proof load 1 x ETP Pile
- Hook up and commissioning of FSO Mekar Bergading
ROV System: 1 x WROV
Start: August 2018
End: August 2018
End Client: MISC / Repsol
Location: Malaysia:
North Malay Basin PM305: 72m water depth
Activities: Provision of Vessel for Recovery of Passenger Transfer Bridge from FPSO Angel
ROV System: Nil
End: August 2018
End Client: MISC / Repsol
Location: Malaysia:
North Malay Basin PM305: 72m water depth
Activities: Provision of Vessel for Recovery of Passenger Transfer Bridge from FPSO Angel
ROV System: Nil
Start: December 2018
End: May 2019
End Client: Qatar Gas
Location: Qatar:
Barzan: 65m water depth
Activities: Pre-lay intervention works and pipeline demolition
ROV System: 2 x WROV
End: May 2019
End Client: Qatar Gas
Location: Qatar:
Barzan: 65m water depth
Activities: Pre-lay intervention works and pipeline demolition
ROV System: 2 x WROV
Start: May 2019
End: May 2019
End Client: Dubai Petroleum Establishments
Location: UAE:
Rashid field: 50m water depth
Activities: Topside lifting
- 1 x 45T module / 1 x 40T module / 1 x 25T module
ROV System: 1 x WROV
End: May 2019
End Client: Dubai Petroleum Establishments
Location: UAE:
Rashid field: 50m water depth
Activities: Topside lifting
- 1 x 45T module / 1 x 40T module / 1 x 25T module
ROV System: 1 x WROV